Srinivasan, V., & Santos, D. (2017). A Heuristic Based On Makespan Lower Bounds in Flow Shops with Multiple Processors. Industrial and Systems Engineering Review, 5(1), 33-43. https://doi.org/10.37266/ISER.2017v5i1.pp33-43