Furtado, J., Mastey, T., Menke, S., Gonzalez, G., Pietz, J., & Wilck, J. (2016). Improving the Production Process for a Medical Device Manufacturing Company using Monte Carlo Simulation. Industrial and Systems Engineering Review, 4(1), 45-53. https://doi.org/10.37266/ISER.2016v4i1.pp45-53