Srinivasan, V., and D. Santos. “A Heuristic Based On Makespan Lower Bounds in Flow Shops With Multiple Processors”. Industrial and Systems Engineering Review, vol. 5, no. 1, Aug. 2017, pp. 33-43, doi:10.37266/ISER.2017v5i1.pp33-43.